Replace Electrical Infrastructure Switchgear
This project was completed in late 2009. The scope of the project was to replace and relocate two existing 15 KV switchgear with new S&C Vista Style Switches and add a third S&C Vista Switch to provide IUPUI Facilities Service more flexibility in maintaining their 13.8 KV Primary Service to the IUPUI College Campus.
The project involved designing and installing primary cable duck banks, auxiliary power circuits to the new switches and extending existing fiber network to the new switches for SCADA service.
Remote control and protective relay panels were installed
adjacent to the switches.